Detailed Selling Lead Description
Manual:
1, Power on, adjust to proper timer, temperature and pressure.
2. When reach proper temperature, adjust switch to " manual " position, try to transfer the product, when quality is good, change to " automatism " position, then batch production.
3.When the switch reach " manual " position, press " manual start-up " heater, timer rise up automatically. If the position is not correct, press " stop urgency ". When switch reach " automatism " position, push the heater to proper position and press downwards automatically.
Note: The whole machine must have the proper firm ground line.